Construction of 3 rock-filled dikes with asphalt core and stabilization of a 120 meters high...
Read MoreTransport of 8 beams of 40 meters long for the construction of the replacement bridge...
Read MoreConstruction of a 2300 M dike with cement-bentonite core near Baker Lake, Nunavut Construction of...
Read MoreActive and passive anchors drilling, installation, grouting and tensioning. Consolidation bolts and wire mesh installation.
Read MoreConsolidation bolts installation , rock wall securing (rope access works).
Read MoreUrethane grouting to channelling water before culvert rebuilding.
Read MoreGrouting works for Goldex Mine’s soil stabilisation. Compaction grouting and large volume grouting.
Read MoreNorth and south circulation tubes drilling and grouting of the Melocheville tunnel. Passive anchors drilling,...
Read MoreConstruction of a cut-off wall, slope stabilization and erosion protection of the upsteam sector of...
Read MoreSupply of clean stones for concrete works at Romaine-3 hydroelectric power plant Crushing of 0-200...
Read MoreConstruction of a rock-filled dam with asphalt core and integrated spillway Romaine River closure Cofferdam...
Read MoreConstruction of the first 58 km of the permanent road for the Romaine 2 Hydro...
Read MoreConstruction of 17 dikes and cofferdams for the Rupert river diversion canal to the Eastmain...
Read MoreBuilding of the operation road and raising dykes Construction of a 50 km road between...
Read MoreKM 84 to 96 and KM 215 to 219 Clearing of vegetation Grubbing and stripping...
Read MoreVarious works for Meadowbank’s mine site Construction of dykes (Bay Goose-Vault-Saddle Dam 1-2) Raising of...
Read More100,000 square feet of hydro demolition for the Stadium`s parking lot and the underside of...
Read MoreHydro demolition of the tunnel walls without clearing the rebar.
Read MoreProduction drilling, pres-splitting drilling and reverse circulation drilling for grade control in the open pit.
Read MoreHydro demolition of the columns and the upper and lower hollow-core lab
Read MoreHydro demolition of the concrete lab and the trimmer joist
Read MoreHydro blasting of 25 ooo square feet of membrane in a digestive reservoir using UHP...
Read More