North and south circulation tubes drilling and grouting of the Melocheville tunnel. Passive anchors drilling, installation and grouting on the Melocheville tunnel north-west wall.
Upgrade spillway with Multi-toron anchors
Drilling and injection of the 17-metre-deep watertight wall
Grouting works for Goldex Mine’s soil stabilisation. Compaction grouting and large volume grouting.
By phone
1 800 263-7705
Write us
Email Us
Apply
Online