Contribute to various infrastructure development and improvement projects in close collaboration with various stakeholders
Read MoreExcavation of the 1st class and reconstruction of an approximately two-kilometre section of the existing...
Read MoreContribute to various infrastructure development and improvement projects in close collaboration with various stakeholders
Read MoreCrushing and screening over 100,000 tons of materials
Read MoreCrushing and screening aggregates for roads, dynamite filler and runways
Read MoreCrushing a variety of materials for road infrastructure
Read MoreDrilling and blasting of water treatment plant pad and basin D
Read MoreExcavating the tailrace cap, concreting the permanent bypass cap and building a conduit bedplate Inject...
Read MoreConstruct a remote section of 138 Road, about 14 km long Drilling and blasting foundations...
Read MoreOperate the open-pit mine Contribute to open-pit mining in terms of drilling and blasting
Read MoreLoad and transport materials for mine operations
Read MoreEarthworks and mine maintenance in partnership with the Waswanipi community
Read MoreConstruction of 3 rock-filled dikes with asphalt core and stabilization of a 120 meters high...
Read MoreTransport of 8 beams of 40 meters long for the construction of the replacement bridge...
Read MoreConstruction of a 2300 M dike with cement-bentonite core near Baker Lake, Nunavut Construction of...
Read MoreActive and passive anchors drilling, installation, grouting and tensioning. Consolidation bolts and wire mesh installation.
Read MoreConsolidation bolts installation , rock wall securing (rope access works).
Read MoreUrethane grouting to channelling water before culvert rebuilding.
Read MoreGrouting works for Goldex Mine’s soil stabilisation. Compaction grouting and large volume grouting.
Read MoreNorth and south circulation tubes drilling and grouting of the Melocheville tunnel. Passive anchors drilling,...
Read MoreConstruction of a cut-off wall, slope stabilization and erosion protection of the upsteam sector of...
Read MoreSupply of clean stones for concrete works at Romaine-3 hydroelectric power plant Crushing of 0-200...
Read MoreConstruction of a rock-filled dam with asphalt core and integrated spillway Romaine River closure Cofferdam...
Read MoreConstruction of the first 58 km of the permanent road for the Romaine 2 Hydro...
Read MoreConstruction of 17 dikes and cofferdams for the Rupert river diversion canal to the Eastmain...
Read MoreBuilding of the operation road and raising dykes Construction of a 50 km road between...
Read MoreKM 84 to 96 and KM 215 to 219 Clearing of vegetation Grubbing and stripping...
Read MoreVarious works for Meadowbank’s mine site Construction of dykes (Bay Goose-Vault-Saddle Dam 1-2) Raising of...
Read More100,000 square feet of hydro demolition for the Stadium`s parking lot and the underside of...
Read MoreHydro demolition of the tunnel walls without clearing the rebar.
Read MoreProduction drilling, pres-splitting drilling and reverse circulation drilling for grade control in the open pit.
Read MoreHydro demolition of the columns and the upper and lower hollow-core lab
Read MoreHydro demolition of the concrete lab and the trimmer joist
Read MoreHydro blasting of 25 ooo square feet of membrane in a digestive reservoir using UHP...
Read More